Kitchen floor change in Valencia
When choosing the flooring, take into account the thickness of the set that will be laid and the joints with other rooms. The passage of the doors, the plinths and the equipment gap must be checked. A soil sample alone does not allow us to know what adjustments will be required in the preserved kitchen.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
What we check before laying the pavement
- Existing baseCondition of the support and adherence of the current pavement.
- WithdrawalRaised from the ground if the project requires it.
- LevellingPreparation of the surface for the new finish.
- HeightsCompatibility with doors, plinths and appliances.
- PlacementInstallation of the flooring chosen according to its conditions.
- JointsTrims on skirting boards, thresholds and furniture.
Kitchen floor replacement quote in Valencia
The area under the dishwasher is also checked
The removal and subsequent placement of an appliance can depend on the available free height and how the pavement reaches its hollow. It should be provided for before the surface is finished. The installation work of appliances should be coordinated with the floor to maintain access to the equipment, instead of solving its lace when the finish is already closed. See also: installation of appliances.
Compare the work with its included transitions
Tell us whether the adjacent soil is preserved and which areas should be protected during the work. The evaluation must collect preparation and auctions, in addition to the new pieces. If the work coincides with a replacement of furniture, consult the change of furniture to order both performances and define where each finish will be finished. See also: furniture change.





